71600: 1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Completed Annual Report | A: 132. Produce Annual Progress Report CY16 (Jan. 1, 2016 thru Dec. 31, 2016) | 01/31/2018 | 01/16/2018 | |
Upload SOW, budget, property inventory for upcoming contract period to Pisces. | C: 119. Manage and Administer Project | 01/31/2018 | 01/30/2018 | |
List of final projects | D: 114. CTUIR Umatilla Subbasin Restoration Coordination | 01/31/2018 | 01/16/2018 | |
Coordinate watershed association activities | E: 191. Umatilla River Watershed coordination duties | 01/31/2018 | 01/30/2018 | |
Provide technical input and summaries to enhance or protect natural resources in the subbasin. | F: 122. Review and provide technical input on issues and topics that affect the areas natural resource | 01/31/2018 | 01/16/2018 | |
Receipt of environmental compliance clearance on project work elements from BPA | G: 165. Produce Environmental Compliance Documentation | 01/31/2018 | 01/16/2018 | |
Complete outreach and education activities | H: 99. Public Outreach and Education | 01/31/2018 | 01/16/2018 | |
Maintain proper operation of instream habitat structures | I: 186. Inspect and maintain function of instream improvement structures | 01/31/2018 | 01/16/2018 | |
Maintenance of habitat features associated with project conservation agreements | J: 186. Maintenance of habitat features associated with project conservation agreements | 01/31/2018 | 01/16/2018 | |
Upload project effectiveness photo point photos to CTUIR data depository. | K: 157. Project Effectiveness Photo Point Monitoring | 01/31/2018 | 01/17/2018 | |
Maximize survival of native vegetation in enhancement project areas. | L: 198. Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 01/30/2018 | 01/17/2018 | |
Complete scheduled tree and shrub plantings in project areas | M: 47. Meacham Creek Floodplain Restoration and In-stream Enhancement, RM's 4.9-6.1 Planting | 01/30/2018 | 12/08/2017 | |
Collect Data on Roads in the Isqúulktpe Watershed to Develop Treatment Options | N: 175. Collect Data on Roads and Culverts to Identify Aquatic Impacts | 01/31/2018 | 01/17/2018 | |
Umatilla River Mainstem - Dillon Dam Irrigation Diversion Structure Removal | P: 184. Dillon Dam Irrigation Diversion Fish Passage Project | 01/31/2018 | 12/31/2017 | |
Complete pre-construction activities necessary to construct the project later in 2017 | Q: 180. Pre-Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 01/31/2018 | 08/15/2017 | |
Wildhorse Creek - Athena Bridge Replacement Design | R: 175. Wildhorse Creek - Athena Fish Passage Project Design | 01/31/2018 | 01/30/2018 | |
Remove Levees and Spur Dikes | S: 180. Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 01/31/2018 | 11/30/2017 | |
Create Floodplain Complexity | T: 29. Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 01/31/2018 | 11/30/2017 | |
Completed channel construction | U: 30. Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 01/31/2018 | 11/30/2017 | |
Lease Individual Allotment Grazing Rights | V: 92. CCR 39580: Grazing lease Bonifer Floodplain Restoration PA 3 & 4 | 01/01/2018 | 10/30/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 132 | Produce Annual Progress Report CY16 (Jan. 1, 2016 thru Dec. 31, 2016) | 02/01/2017 | ||||||
B | 185 | Periodic Status Reports for BPA | 02/01/2017 | ||||||
C | 119 | Manage and Administer Project | 02/01/2017 | ||||||
D | 114 | CTUIR Umatilla Subbasin Restoration Coordination | 02/01/2017 | ||||||
E | 191 | Umatilla River Watershed coordination duties | 02/01/2017 | ||||||
F | 122 | Review and provide technical input on issues and topics that affect the areas natural resource | 02/01/2017 | ||||||
G | 165 | Produce Environmental Compliance Documentation | 02/01/2017 | ||||||
H | 99 | Public Outreach and Education | 02/01/2017 | ||||||
I | 186 | Inspect and maintain function of instream improvement structures | 02/01/2017 | ||||||
J | 186 | Maintenance of habitat features associated with project conservation agreements | 03/08/2017 | ||||||
K | 157 | Project Effectiveness Photo Point Monitoring | 02/01/2017 | ||||||
L | 198 | Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 03/08/2017 | ||||||
M | 47 | Meacham Creek Floodplain Restoration and In-stream Enhancement, RM's 4.9-6.1 Planting | 10/16/2018 | ||||||
N | 175 | Collect Data on Roads and Culverts to Identify Aquatic Impacts | 02/01/2017 | ||||||
O | 184 | WE CANCELLED PER CCR 39065: Wildhorse Creek - Athena Fish Passage Project Implementation | |||||||
P | 184 | Dillon Dam Irrigation Diversion Fish Passage Project | 02/01/2017 | ||||||
Q | 180 | Pre-Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 10/16/2017 | ||||||
R | 175 | Wildhorse Creek - Athena Fish Passage Project Design | |||||||
S | 180 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 10/17/2017 | ||||||
T | 29 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 10/16/2017 | ||||||
U | 30 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 3 & 4 | 10/16/2017 | ||||||
V | 92 | CCR 39580: Grazing lease Bonifer Floodplain Restoration PA 3 & 4 | 02/01/2017 |